Skip to content
Back to all services

EMC — Electromagnetic Compatibility

We support testing, reporting and conformity processes for the electromagnetic compatibility of devices (2014/30/EU).

Related HS chapters

848590

Chapter information is indicative; the actual obligation depends on the product's function.

The Electromagnetic Compatibility Directive (2014/30/EU) requires a device not to emit electromagnetic interference above acceptable limits, and to be immune to such interference itself. For most electrical and electronic products EMC comes together with low voltage obligations; the two require separate test reports, and the file is not complete while either is missing.

What this service covers

  • EMC scope assessment and identification of the required test set
  • Adequacy review of EMC test reports — emission and immunity
  • Conformity assessment and review of the declaration
  • Technical file review
  • Management of additional obligations for products falling under radio equipment rules
  • CE marking process support

How the process works

How the process works

  1. Scope and test set

    We determine which EMC standards the product must be tested against.

  2. Test report review

    We check whether existing reports cover the product and the correct standards.

  3. Technical file review

    We complete the file and verify the declaration of conformity.

  4. CE support and conclusion

    We support the CE marking process and close the file.

Most common mistakes

Most common mistakes

The items below are the rejection grounds we encounter most often in practice. We check every one of them before filing.

  • Carrying out emission testing only and skipping immunity testing
  • Test report not reflecting the product's final configuration
  • Relying on EMC alone for a product containing a radio module
  • Declaration of conformity making no reference to an EMC standard

Free preliminary assessment

Do you have a shipment in this product group?

Send us your HS code and product details. We will confirm in writing whether it is subject to inspection, which documents you will need and how long it will take.

Leave blank if you don't know it — we can identify it from the description.

Let's talk before your shipment leaves

The permit process becomes most expensive when it starts after the goods reach the port. Send us the proforma invoice and we'll tell you today what timeline to work to.