Forklift & Construction Machinery Import
Machinery safety, noise emission and used-goods permit processes for forklifts, pallet trucks, cranes and construction machinery.
Related HS chapters
Chapter information is indicative; the actual obligation depends on the product's function.
Forklifts and construction machinery are assessed under both the Machinery Safety Regulation and the noise emission rules for equipment used outdoors. Because most imports in this category are second-hand, the process usually runs alongside a used-goods import permit.
What this service covers
- Scope assessment for machinery safety and noise emission
- Ministry of Trade permit application for used machinery
- Management of additional certification requirements for lifting equipment
- TAREKS application and TSE inspection follow-up
- Operator manual and Turkish warning label compliance
- Coordination of site preparation ahead of inspection
How the process works
How the process works
Status assessment
We establish whether the machine is new or used and which permit and inspection regime applies.
Permit and document preparation
Where required we open the used-goods permit and prepare the conformity file in parallel.
Inspection process
We file the TAREKS application and organise the inspection appointment and site preparation.
Delivery
We obtain the reference number and run the appeal process where necessary.
Most common mistakes
Most common mistakes
The items below are the rejection grounds we encounter most often in practice. We check every one of them before filing.
- Noise emission label missing from the machine
- Skipping the permit application for used machinery
- Illegible or incomplete load diagram
- Operator manual not available in Turkish
Free preliminary assessment
Do you have a shipment in this product group?
Send us your HS code and product details. We will confirm in writing whether it is subject to inspection, which documents you will need and how long it will take.
Let's talk before your shipment leaves
The permit process becomes most expensive when it starts after the goods reach the port. Send us the proforma invoice and we'll tell you today what timeline to work to.

