Skip to content
Back to all services

Machinery Directive

We provide technical support for the EU conformity processes of machinery and equipment (2006/42/EC).

Related HS chapters

848587

Chapter information is indicative; the actual obligation depends on the product's function.

The Machinery Directive (2006/42/EC) establishes a safety chain running from design through to the user manual. Its Annex IV lists machinery for which conformity assessment must involve a notified body; whether a machine appears on that list determines the length and cost of the process from the outset. For product groups with heavy second-hand import volumes, such as forklifts and construction machinery, noise emission obligations also come into play.

What this service covers

  • Annex IV scope analysis — determining whether a notified body is required
  • Review of the risk assessment and identification of gaps
  • Preparation and adequacy check of the technical file
  • Compliance of the user manual and machine plate
  • Assessment of noise emission obligations
  • CE marking advisory and review of the declaration of conformity

How the process works

How the process works

  1. Annex IV scope analysis

    We determine whether the machine appears in Annex IV and which conformity assessment route applies.

  2. Risk assessment

    We review the existing risk analysis and complete any hazard categories left out.

  3. Technical file and manual

    We bring the file and the Turkish operating manual into compliance.

  4. CE marking and conclusion

    We check the machine plate and CE marking and close the process.

Most common mistakes

Most common mistakes

The items below are the rejection grounds we encounter most often in practice. We check every one of them before filing.

  • Taking the self-declaration route for a machine within Annex IV
  • No risk assessment having been carried out at all
  • Operating manual not available in Turkish
  • Machine plate missing the year of manufacture or serial number

Free preliminary assessment

Do you have a shipment in this product group?

Send us your HS code and product details. We will confirm in writing whether it is subject to inspection, which documents you will need and how long it will take.

Leave blank if you don't know it — we can identify it from the description.

Let's talk before your shipment leaves

The permit process becomes most expensive when it starts after the goods reach the port. Send us the proforma invoice and we'll tell you today what timeline to work to.